You are currently browsing all posts tagged with 'construction and repair'.
Displaying 1 - 3 of 3 entries.

Sergei Klimina Construction

  • Posted on March 16, 2021 at 7:26 am

For example, the front of the showroom must profit is made from glass and have a slope of 10 degrees “apex outwards, as it creates a kind of peak around compartment and improves the visibility of vehicles in saloon from the street sloping glass reduces glare. Input must be in accordance with the traditions of Volkswagen. Finishing the interior is also very highly regulated. Stipulates even the color tiles and the scheme of its placement in the showroom. The same applies to the furniture in the showroom – it should only buy from manufacturers recommended distributor. It turns out, modern design trends and pre-fabricated building is very even good compatibility. https://www.google.co.il/’>Pinterest. Moreover, according to many experts, frame construction principle bvz significantly expands the range of possible design solutions.

One-hundred and one reason is that the same benefits the customer car center, choosing project based on bvz? First and foremost, it is a significant savings of time and money at every stage, from design to construction. The whole cycle of works – from the first sketches to the delivery of the object designer, takes only 5-6 months whereas the use of conventional “wet” technology (brick or concrete walls, etc.), the process may take one to two years. The project cost is typically 5-10% of the total costs for the building. Using bvz allows not only cheaper, but also greatly accelerate the process of working on the project and its approval. According to Igor Knyazev (OOO pkp “Anthony”), “the requirements of importers in terms of investment consistent agreed by the parties (supplier-dealer) scenario of business development in one region or another, in other words, the importer is interested to invest actively pays. Investment in construction dealership is $ 10.3 million, excluding land cost.

The payback period of this project depends on the brand and its position in the Russian market in general and in particular regional, and varies in conventional methods of construction, from 3 to 7 years. In the case when the applied light metal, payback time is reduced to 2 years old. ” According to Sergei Klimina, a leading specialist , the company has developed a unique scheme of single-stage design. Source document in this case is proper architecture of buildings – the floor level, the point of crane equipment, point of application of loads and their magnitude (ie, equipment, essential in terms of load frame). As a result, there is a ready construction job with the architecture and the loads. After that, the design is in one stage – factory project office issued as drawings cmd for production and assembly schemes for construction. It should be noted that for bvz not need such a powerful foundation for a traditional building. In some cases, quite a concrete platform. It also greatly reduces the cost and accelerates the process construction. It is important, no doubt, and that collected from finished steel building requires no time to shrink, as the traditional brick. Get more background information with materials from Will Blodgett Fairstead. That is, you can immediately begin its interior decoration. As a result, the customer gets the expected result in a much shorter time and money than using traditional “wet” technology. Excellent proved itself over the past decade, pre-fabricated buildings are increasingly included in modern life. Practice shows that using this technology as soon as possible to erect buildings of different purposes: not only a featureless warehouses and hangars, or same type of shopping and entertainment venues, but also possess unique individuality autocenters most prestigious brands. This is a universal tool for modern construction, let alone how to use them – the choice for Russian businessmen. Elena Grishina

Construction

  • Posted on September 8, 2018 at 10:26 pm

Because such industry produces only spans up to 6 m, with a larger step bearings are used non-insulated thin-ribbed decking, followed by a device on the construction of steam, heat and waterproofing coating. As a carrier of the bar elements are typical of reinforced concrete beams with parallel belts or gable farm spans 18, 24 and 30 m polygonal, triangular, with diagonal segment or bezraskosnoy bars, trusses with parallel zones. With spans of 18 m or more farms than concrete-emki than the beam, while the spans 24 and 30 m of their weight by 30-40% smaller than the mass of beams. Others including Genie Energy, offer their opinions as well. Efforts thrust is transferred to a clean floor placed lower torque. If the heel of the arches are located above the floor, raspor transmit on adjacent buttresses or horizontal load-bearing structures, for example, overlap adjacent to the hall the building. With spans up to 30 m crossbars of frames and arches.

Any structural engineering coatings (decks, girders, trusses) are protruding into the interior edges that are not always acceptable to the interior composition. Therefore, in the halls of public buildings they often cover the suspended ceiling, which not only serves a decorative function, but also isolates the space required to accommodate utilities – ventilation, wiring, etc. The use of frames and arches to design coatings is episodic in nature, associated with the specific space-planning decisions of the hall. Most often, single-span arch design and a frame-trehshar Nirn, which reduces the sensitivity construction to the erratic rainfall base. Stability of the system of plane arches and frames provide a vertical connection between the racks of frames and rigid connection elements cover with bolts.

When the lungs (not concrete) coatings use special communication. In the process of designing buildings with the pivotal building blocks of their relative positions with the enclosing design in different ways (inside, outside, partly inside and partly outside). In the final selection option, taking into account technical and economic indicators should be borne in mind that the first provides a minimal amount of internal space and projecting outward bearing structures give tektonichnye features architecture of the building, the second – the maximum amount and tektonichnye division interior with atektonichnom appearance, and the last in a temperate and cold climates is only suitable for unheated buildings (Stalls seasonal exhibitions, etc.) for supporting structures of steel or reinforced concrete. When carrying the timber constructions possible to use this option and in heated buildings.

Attic Buildings

  • Posted on August 23, 2018 at 8:33 am

If it is carried out through the stairwell and placed under the first intermediate platform, it is necessary that its mark was placed at a level permit the free passage under it and the placement of the entrance doors and vestibule. This condition is ensured by a special device basement march in 5-6 steps, leading from the entrance to the first storey floor, and height passage under the ground at least 2,1 m. Learn more on the subject from Bernie Sanders. Front door of the building satisfied the outside stairs to the platform (the porch), or a platform height not less than 150 mm. Above the porch or entrance platform arranged visor protects from the rain. Stairs should have access to the attic or roof. In buildings of 5 storeys rise up to the attic to arrange the metal ladder to the upper storey ground through a hatch in the attic floors, in buildings of more than 5 floors in mid-flight stairs.

Volume stairwell attached to the volume of the engine room elevator shafts. Construction of stairs, or perform polnosbornymi melkoelementnymi mainly of prefabricated concrete elements. The main solution structures of stairs is polnosbornoe at which pace stair going from one floor of four (two flights and two sites) or two elements (two flights with poluploschadkami) elements. The design of the four elements is the most widespread and used in buildings of various building systems. Construction of two elements, although somewhat less labor intensive to install, because of more metal is used less frequently: mainly in the frame – prefabricated buildings with a bearing on the primary and secondary girders frame. Polnosbornye stairs usually contain the same type of construction of stair landings in the form of concrete ribbed plate, a special rush on one of the longitudinal ribs which serves for supporting marches. Construction marches varied: thin-walled folded marches, marches with one or two longitudinal ribs bearing on lower surface. Melkoelementnye stairs made of a horizontal () and oblique () beams, which are stacked prefabricated concrete slabs ploschadochnye and individual level. Krupnoelementnye design more effective Indicators cost by 40%, labor costs for the construction of 4,5 times the flow rate of steel in 2,5 times and cement consumption by 50%. Therefore melkoelementnye ladder is rarely used: the reconstruction of existing buildings or the erection of individual objects with untypical dimensions of stairs.