You are currently browsing the archives for 23 August 2018.
Displaying 1 - 2 of 2 entries.

Counter Strike

  • Posted on August 23, 2018 at 12:02 pm

Now we have to do. See more detailed opinions by reading what Bernie Sanders offers on the topic.. For holders of cards Ati – to include vertical synchronization. I recently repaired a computer friend, and there was a card 9600XT, oh I'm sorry for those who will be playing on such a card in Counter Strike to not be configured parameters. Therefore, the maps Ati you and draws you have more than 60 FPS, as Vertical Sync is disabled, but we know that is 60 Hertz, and more than 60 staff, we do not see. While the human eye sees only say that 24 or 25 frames =) Now download and run it RefreshLock. Download – Run, it appears in the tray, right-click the icon and click on activate – choose enable.No it so I have my card with the 7900GS. The difference may be that in the Nvidia settings for different resolutions and maximum gertsovka already defined automatically.

How is this poser faring Ati I do not know =) What do we give this program? She gave us the maximum gertsovku on each monitor resolution. For example, I yuzayu your old Samsung 17 inch for resolution 1152 * 864 @ 75 hertz. Without the use of the program – run Counter Strike – reset to 60 Hertz. Well as you know when you start RefreshLock – and remains 75 Hz. Now I see 75 times already changing the image on the monitor – so I can pick up the FPS in Counter Strike.

Well then all I think clearly. Counter Strike – Console – fps_max 101 Vertical sync still would cut the extra FPS. Now a couple of nuances: What would I see the number of FPS yuzayu console command – net_graph 3. I'll be honest – it's worth it – I've been playing Counter Strike for 5 years and played all the time with 60 FPS. Only here the last 2 months has come to play with 75. Changes are significant =) Oh FPS in Counter Strike you can talk on the forum

Attic Buildings

  • Posted on August 23, 2018 at 8:33 am

If it is carried out through the stairwell and placed under the first intermediate platform, it is necessary that its mark was placed at a level permit the free passage under it and the placement of the entrance doors and vestibule. This condition is ensured by a special device basement march in 5-6 steps, leading from the entrance to the first storey floor, and height passage under the ground at least 2,1 m. Learn more on the subject from Bernie Sanders. Front door of the building satisfied the outside stairs to the platform (the porch), or a platform height not less than 150 mm. Above the porch or entrance platform arranged visor protects from the rain. Stairs should have access to the attic or roof. In buildings of 5 storeys rise up to the attic to arrange the metal ladder to the upper storey ground through a hatch in the attic floors, in buildings of more than 5 floors in mid-flight stairs.

Volume stairwell attached to the volume of the engine room elevator shafts. Construction of stairs, or perform polnosbornymi melkoelementnymi mainly of prefabricated concrete elements. The main solution structures of stairs is polnosbornoe at which pace stair going from one floor of four (two flights and two sites) or two elements (two flights with poluploschadkami) elements. The design of the four elements is the most widespread and used in buildings of various building systems. Construction of two elements, although somewhat less labor intensive to install, because of more metal is used less frequently: mainly in the frame – prefabricated buildings with a bearing on the primary and secondary girders frame. Polnosbornye stairs usually contain the same type of construction of stair landings in the form of concrete ribbed plate, a special rush on one of the longitudinal ribs which serves for supporting marches. Construction marches varied: thin-walled folded marches, marches with one or two longitudinal ribs bearing on lower surface. Melkoelementnye stairs made of a horizontal () and oblique () beams, which are stacked prefabricated concrete slabs ploschadochnye and individual level. Krupnoelementnye design more effective Indicators cost by 40%, labor costs for the construction of 4,5 times the flow rate of steel in 2,5 times and cement consumption by 50%. Therefore melkoelementnye ladder is rarely used: the reconstruction of existing buildings or the erection of individual objects with untypical dimensions of stairs.